Tempo and Timelink Integration
Keep Tempo and Timelink matched by integrating their events and actions. When hr events happen in Tempo, update the Timelink automatically - without any line of code in visual workflow builder.
- 3-day trial
- Cancel anytime
- Up to 10 minutes quick set up
- GDPR
- Data Encryption
- 2FA
- Local Data Region
Learn about Tempo and Timelink
Detailed info you need to know about Tempo and Timelink integrations in WEXTL. Explore which modules apps support and how you connect them.
How to connect Tempo to Timelink
Set up your Tempo and Timelink integration in 3 simple steps[2]. No coding required. Up to 10 minutes setup.
STEP 1
Connect Tempo and Timelink
Save credentials in WEXTL once. We store them encrypted and reuse the authorization across every workflow[3]. No coding or API skills required.
STEP 2
Build a workflow
Paste selected Tempo and Timelink nodes onto the canvas[4], or describe what you want and WEXTL wires the flow together with AI Builder.
STEP 3
Map your data
Choose which fields need to sync between Tempo and Timelink. Use filters or a JS custom code step in between. Everything is on the canvas.
How does the integration between Tempo and Timelink work in WEXTL?
WEXTL exposes actions and triggers for Tempo and Timelink that help you connect apps and automate repetitive tasks[1]. A trigger is an event that happens, and an action is a step that performs when the event has occurred.
Tempo triggersTimelink actions
Tempo modules
- Add Project Time Approvers Adds approvers for the time logged on a project. Use Approver IDs to give Jira account IDs or Tempo user IDs.
- Approve a Period of Project Time Approves the hours logged on a project for the dates from From to To, for the team members listed under Team ID. Add a Comment to leave a note with the approval. Returns the Status and Reviewer.
- Approve a Timesheet Approves the timesheet of a user for a period that starts at From. Use Reviewer Account ID to record the approver and Comment to leave a note.
- Create a Customer Creates a customer in Tempo from a Key and a Name. Returns the new ID.
- Create a Project Creates a project with a Name, plus a Reference and Type for its source, such as a filter ID. Set Currency Code and Default Cost Rate for the currency and cost rate, and turn on Tracking Revenue to track revenue.
- Create a Project Team Member Rate Sets a cost or billing rate for a team member, starting on the Effective Date. Use Category to say which kind of rate it is, and add a Role ID to tie it to a role.
- Create a Report Builds a costs and revenues report across the dates from Start Date to End Date for an Entity, split by Period Breakdown. Planned Report Type values need Tempo Planner installed. Use Report Name to give the result a title.
- Create a Team Makes a new team from a Team Name. Add a Lead Account ID for the team lead, a Program ID to link a program, or turn on Administrative to mark it as an administrative team.
- Create a Team Membership Puts a user on a team, giving From and To dates for how long the membership lasts. Set Commitment Percent between 0 and 100, and a Role ID for the member.
- Create an Account Opens an account under a Key, Name, Status and Lead Account ID. Attach a customer and a category with Customer Key and Category Key, and set a budget with Monthly Budget.
- Create an Expense Records an expense on a project with its Date, Description, Value and Type. Add a Category, or set Recurrence to repeat the expense monthly.
- Delete a Customer Deletes an existing customer entry from Tempo.
- Delete a Project Removes a project record in Tempo.
- Delete a Project Team Member Rate Removes the rate that was set for a member of a project team.
- Delete a Project User Rate Deletes a user rate that was set on a project, such as a cost rate.
- Delete a Report Removes a costs and revenues report from Tempo.
- Delete a Team Removes a team from the Tempo service.
- Delete a Team Membership Ends the membership of a user in a team by deleting it.
- Delete an Account Deletes an account in your Tempo workspace. It stays gone.
- Delete an Account Link Removes the link between an account and a Jira project.
- Delete an Expense Deletes an expense entry on a project.
- Get a Customer Fetches one customer with its ID, Key and Name.
- Get a Project Reads one project and shows its Budget, Default billing rate and Auto sync setting.
- Get a Report Loads a costs and revenues report with its Report name, Status and Period breakdown.
- Get a Team Gets one team with its Lead, Members, Program and Summary.
- Get a Team Membership Gets one team membership, showing its From, To, Role and Commitment percent.
- Get an Account Reads one account with its Key, Status, Lead and Monthly budget.
- Get an Account Link Gets an account link, with its Scope, the Account it joins to the project and whether it is the Default.
- Get an Approval Labour Cost Returns the labor cost entries behind a project time approval for a team, over the dates from From to To. Each entry shows its Cost, Billable seconds and Worklog ID.
- Get an Expense Reads one expense of a project, with its Amount, Category, Date and Description.
- Get Project Time Approvers Shows who is set up to approve the time logged on a project, as Project time approvers.
- Get Report Data Gets the numbers of a report, including its Periods, Total amount and Total effort in seconds.
- Get the Current Timesheet Approval Looks up the current timesheet approval of a user from From onward, with To as an optional end. Returns its Status, Reviewer and Time spent seconds.
- List Account Links of a Project Shows the account links of one Jira project. Turn on Include Global Accounts to add global accounts to the list, and set Limit to keep the list short. Each link shows its Scope.
- List Account Links of an Account Shows the links on an account. Each link has its Scope and whether it is the Default. Use Limit to set how many links are fetched.
- List Accounts Lists the Tempo accounts with their Key, Name, Status and Lead. Use Limit to set the maximum number of results.
- List Customer Linked Accounts Lists the accounts linked to one customer, each with its Key, Name and Status. Use Limit when the customer has many.
- List Customers Returns the customers in Tempo. Each one shows its ID, Key and Name. Use Limit to set the maximum number of results.
- List Expenses Reads the expense records of a project, each with its Cost and Date. Use To to set the last date, which defaults to today on the server, and Limit to cap the results.
- List Latest Project Time Approvals Lists the latest project time approvals for a team member within a window starting at From and ending at To. Use Limit to cap the count, and each entry shows its Status and Reviewer.
- List Planned Labor for a Project Shows the labor planned on a project from From Date until To Date. Each entry has its Planned seconds, Cost and Revenue.
- List Plans for Review Gets the plans waiting for review. Turn on Include Past Plans to cover plans already in the past, use Statuses to filter them and set Limit to cap the count. Each plan shows its Assignee and Planned time.
- List Possible Plan Reviewers Gets the people who could review the plans of one user, optionally narrowed with From Date and To Date. Use Limit to stop after a set number of reviewers.
- List Project Expenses Lists expenses recorded on a project, showing the Amount, Category and Recurrence of each. Add Limit for a smaller list.
- List Project Labour Reads the labor actuals of a project, with Cost, Billable seconds and User on every entry. Leave To blank to count up to today on the server, and use Limit to cap the results.
- List Project Time Approvals Shows the time approvals of a project and team from Start Date to End Date. Use Status to keep only approvals in one state, such as approved or rejected.
- List Projects Pulls the projects in Tempo, each with its ID, Budget and Default billing rate. Set Limit to fetch fewer.
- List Reports Fetches the costs and revenues reports in Tempo, each with its Report name, Report type and Status. Use Limit to stop after the first few.
- List Team Members Shows who belongs to a project team and the Role each member holds.
- List Team Members with Their Rate Shows the people on a project team along with their Cost rates and Billing rates. Use Limit to fetch fewer members.
Timelink modules
- Create a Client Adds a client named Name. Use Ext Tool ID to store your own reference for it, and Billable to mark whether time on it is billable.
- Create a Project Starts a project from a Name, optionally under a Client. Use Budget Type with Available Budget to set a budget, or Ext Client ID to link the client by your own reference.
- Create a Service Defines a kind of work people can log time on from a Name. Add a Default Time Entry Description to prefill new entries.
- Create a Time Entry Records worked time for a user starting at Started At. Add Ended At, or leave the entry running, and attach a Client, Project, Service and Description.
- Create a User Adds a person to TimeLink from a First Name, Last Name and Email. Set Admin Level, Timezone and Language to configure the account.
- Delete a Client Deletes a customer record and returns its ID with Success.
- Delete a Client by External ID Removes the client that carries a given External ID, the reference your own system stored, and reports Success.
- Delete a Project Deletes a project, reporting its ID and Success.
- Delete a Project by External ID Removes the project whose Ext Tool ID matches the External ID provided, answering with Success.
- Delete a Service Deletes a work type from your company, answering with its ID and Success.
- Delete a Service by External ID Removes a service reached through its External ID instead of the TimeLink ID, then reports Success.
- Delete a Time Entry Deletes one logged entry from the record and reports Success.
- Delete a Time Entry by External ID Removes a logged entry that your system tracks under an External ID, and reports Success.
- Delete a User Deletes a person from the team, answering with the ID and Success.
- Delete a User by External ID Removes the person whose External ID was assigned elsewhere, and reports Success.
- Export Time Entries Builds a file of time entries. Narrow it between Start and End, or by Client, Project, Service and Users, and receive the File, File Name and Content Type.
- Get a Client Fetches one customer, returning its Name, Info and Color.
- Get a Client by External ID Reads a customer through the External ID from your own records, returning its Name and Color.
- Get a Project Opens one project, returning its Name, Client ID and Ext Tool ID.
- Get a Project by External ID Finds a project filed under an External ID elsewhere and returns its Name and Info.
- Get a Service Reads one type of work, returning its Name and Company ID.
- Get a Service by External ID Retrieves a work type tracked under an External ID in another tool, returning Name and Info.
- Get a Time Entry Fetches one logged entry, returning its User ID, Client ID, Project ID and Description.
- Get a Time Entry by External ID Reads logged time that carries an External ID from your own system, returning its User ID and Service ID.
- Get a User Pulls one team member, returning their First Name, Last Name and Email.
- Get a User by External ID Looks up a person whose External ID comes from another system, returning their Full Name and Email.
- Get an Image Downloads a stored picture by its Image ID.
- Get Company Details Reads the profile of your TimeLink company: Name, Address, City, Zip and Country.
- Get Required Time Entry Fields Lists the fields your company requires when someone logs time.
- Get Time Entry Conflicts Finds pairs of entries that overlap, listed as Entry A, Entry B and the Type of clash. Use Limit to restrict the number of pairs.
- Get Token Details Reads the API token behind your credential: its Name, Abilities, Last Used At and Expires At.
- List Active Time Entries Shows entries that are running right now. Turn on With Relations to expand linked records, and use Limit to bound the result.
- List Clients Browses clients, filtered by Search text or Active status. Turn on With Limited Part of Projects and set Projects Limit to include a few projects per client.
- List Projects Pulls projects, optionally limited by Search, by Active, or by the Client they belong to.
- List Services Collects the types of work defined in your company, filterable by Search text or by Active status.
- List Time Entries Retrieves logged entries from Start to End, filtered by User, Client, Project, Service or Ext Tool ID. Use Search to match text in the entries.
- List Users Gathers the people in your company. Use Search to narrow them by text, and Active to leave out inactive accounts.
- Make an API Call Sends a free-form request to the Timelink REST API, signed with your saved credential.
- Search Clients Finds clients on the server side. Pass IDs for specific clients, Orders for sorting, and Search for matching text.
- Search Projects Queries projects. Combine IDs to pick specific projects, Orders to sort, and Client to stay with one customer.
- Search Services Looks for services by IDs, matching text from Search, and arranges results with Orders.
- Search Time Entries Searches entries inside a window from Start to End. Filter by User, Client, Project, Service or Billed.
- Search Users Runs a server-side user search. Turn on Active to drop deactivated accounts, pass IDs to pick specific people, and add Orders to sort the matches.
- Update a Client Changes a customer: Name, Info, Color, Active, Billable or Acronym. Choose values to empty with Clear Fields.
- Update a Client by External ID Rewrites a customer found via your own External ID, changing Name, Info or Color. Use Clear Fields to empty a value.
- Update a Project Modifies a project through Name, Client, Budget Type, Available Budget or Active. Empty a value through Clear Fields.
- Update a Project by External ID Revises a project via the External ID of your own system: Name, Ext Client ID or Budget Type.
- Update a Service Corrects a work type by rewriting its Name, Default Time Entry Description, Color or Billable. Use Clear Fields to wipe a value.
- Update a Service by External ID Alters a work type through your own External ID, adjusting Name, Acronym or Active.
- Update a Time Entry Corrects a logged entry: Started At, Ended At, Client, Project, Service or Description. Mark it Billable or set Billed At as needed.
Explore alternative integrations
There are other apps[9] supported by WEXTL that can be paired with Tempo and Timelink integrations. Pick any from the list below if the current combination isn't the one you need.
Frequently asked questions
Common questions about connecting Tempo and Timelink.
References
List of sources used to gather information about the Tempo and Timelink integration.
- Tempo and Timelink integration source code, module specs and credentials implementation.
- Our Tempo and Timelink integration documentation, structured input and output parameters, scopes, and authentication methods.
- Official vendor API documentation for Tempo and Timelink, used to verify field meanings, authentication flows, and anything our own specs don't fully capture.
- WEXTL® visual workflow builder, anonymized data from our technical support team.
- Tempo integration information
- Timelink integration information
- WEXTL® Scheduling
- WEXTL® Pricing and Trial
- WEXTL® Apps Library
How we write our apps documentation
Explore how WEXTL® crafted Tempo and Timelink integration page documentation. Used sources, the role of AI, and how the team validates the result.

