Connect Float integrations
VerifiedResource planning for people, projects and schedules, connected to WEXTL workflows and AI agents. Turn Float project events into updates across your delivery stack. When Watch Allocations arrives, run Get a Client or Get a Currency so the team stays aligned.
- 3-day trial
- Cancel anytime
- Up to 10 minutes quick set up
- GDPR
- Data Encryption
- 2FA
- Local Data Region
Supported triggers and actions for Float integration
Triggers can detect changes in Float and run actions that can create, search or modify data inside Float automatically[3], exactly how you set them.
- Watch Allocations Fires for an allocation that is created or edited, detected by a scheduled check. Add Project or Person to follow a narrower set.
- Watch Deleted Allocations Reads the allocation delete log at each check and starts the workflow per entry, giving its ID and Timestamp.
- Watch Deleted Logged Time Entries Starts the workflow for each deletion found in the logged time delete log, reporting the ID and Timestamp.
- Watch Deleted Time Off Entries Looks through the leave delete log every cycle and triggers on each entry, with its ID and Timestamp.
- Watch Logged Time Entries Runs a periodic check for time entries that are new or edited and triggers on each. Add Project to follow fewer entries, or Person for one team member.
- Watch Phases Each cycle looks for phases that were added or modified and starts the workflow for them. Use Project or Active to narrow the scope.
- Watch Projects Catches added or modified projects at every check. Filter by Client to follow one client, or by Active for only active or archived projects.
- Watch Team Members Spots team members who are new or edited since the last cycle. Use Active to follow only active or only archived people.
- Watch Time Off Entries Triggers on leave bookings that are new or edited. Use Time Off Type to follow one category.
- Get a Client Retrieves one client, returning its Client ID and Name.
- Get a Currency Shows one added currency with its Source Currency and Target Currency. Use Expand to include the FX Rates.
- Get a Department Looks up one department, giving its Department ID, Name and Parent ID.
- Get a Logged Time Entry Reads one logged time entry with its Hours, Date, Billable flag and Notes.
- Get a Milestone Fetches a milestone with its Date, End Date and the project it belongs to.
- Get a People Report Builds a per-person hours report for the days between Start Date and End Date, covering Capacity, Scheduled, Billable and Overtime. Add Person to report on one person only.
- Get a Person Retrieves one team member with their Email, Job Title and Department. Use Expand to add the Account, Managers or Contracts.
- Get a Phase Reads one phase with its Start Date, End Date and Budget Total. Use Expand to add the Phase Team.
- Get a Project Fetches a project with its Client ID, Budget Type and Default Hourly Rate. Use Expand to add Expenses, Phases, Project Tasks, Project Team or Currency.
- Get a Project Expense Reads one expense along with its Cost, Quantity and Markup, and whether it is Billable.
- Get a Project Report Builds a per-project hours report for the days between Start Date and End Date, covering Scheduled, Billable and Non-Billable. Add Project to report on one project only. Float allows 30 report requests a minute.
- Get a Project Stage Looks up one stage with its Project Status and Sort Order. Use Expand to add the Project Count.
- Get a Project Task Retrieves a project task along with its Task Name and Budget, and whether it is Billable.
- Get a Project Template Reads a template made in Float, with its Budget Type, Budget Total and Currency Code.
- Get a Public Holiday Fetches one public holiday with its Region and Dates. Set Year, or a Start Date plus End Date, to narrow the dates returned.
- Get a Rate Card Reads a rate card with its Currency Code and Client Ids. Use Expand to add the Roles or Project Count.
- Get a Role Retrieves a role with its Default Hourly Rate. Use Expand to include the Cost Rate History, Person IDs or People Count.
- Get a Status Shows a status with its Status Name, Start Date, End Date and Repeat State.
- Get a Team Holiday Fetches a team holiday, giving its Name, Date and End Date.
- Get a Time Off Entry Reads one leave booking, giving the Timeoff Type ID, Person IDs and Status of that booking.
- Get a Time Off Type Looks up one leave category, returning its Timeoff Type Name and Color, and whether it is Active.
- Get an Account Returns one account with its Name, Email, Timezone and Account Type. Use Expand to include the Person ID.
- Get an Allocation Fetches one allocation with its Start Date, End Date, Hours and Person ID.
- List Accounts Shows Float accounts with their Email, Access and Last Login. Use Expand to add the Person ID.
- List Allocations Finds allocations by Project, Person, Client or a date range. Use Modified Since to keep only records changed after a given time.
- List Clients Returns the clients in your Float account, each with a Client ID and a Name.
- List Currencies Lists the added currencies with their Source Currency and Target Currency. Use Expand to add the FX Rates.
- List Deleted Allocations Reads the delete log of allocations, with the ID and Timestamp of each deletion. Float keeps the log for 72 hours.
- List Deleted Logged Time Shows the delete log of logged time entries, each with an ID and Timestamp. The log must be switched on in Float.
- List Deleted Time Off Returns the delete log of leave bookings, giving the ID and Timestamp of each one.
- List Departments Retrieves departments together with their Name and Parent ID.
- List Logged Time Finds time entries for a Person, Project, Phase or Project Task, restricted to a Start Date and End Date.
- List Milestones Pulls milestones for a given Project, Phase or Client.
- List People Finds team members. Filter with Active, Department, People Type, Employee Type, Email or Tag.
- List Phases Gets phases, narrowed by Project, Active or Billable. Use Modified Since to see recent changes only.
- List Project Expenses Reads recorded expenses with their Cost and Date, across all projects or for one Project.
- List Project Stages Lists project stages with their Project Status and Sort Order. Use Active to hide archived ones.
- List Project Tasks Lists project tasks with their Task Name and Budget, optionally for one Project or only Billable ones.
- List Project Templates Lists templates made in Float, each with its Name and Budget Type.
- List Projects Browses projects by Client, Status, Active, Billable, Project Code or Tag. Use Modified Since to keep only recent changes.
- List Public Holidays Lists public holidays, narrowed by Region ID or Year, or by a range from Start Date to End Date.
- List Rate Cards Lists rate cards, restricted by Clients, Currency or Active. Use Expand to add the Roles or Project Count.
- List Roles Lists job roles with their Default Hourly Rate. Use Expand to add the Cost Rate History, Person IDs or People Count.
- List Statuses Lists person statuses such as Home or Office, filtered by Person or Status Type, with an optional Start Date and End Date.
- List Team Holidays Lists team holidays with their Name, Date and End Date.
- List Time Off Finds leave bookings for a Time Off Type, Full Day or Status, between Start Date and End Date.
- List Time Off Types Lists leave categories with their Timeoff Type Name and Color. Use Active to filter by state.
- Add a Client Adds a client to Float under a Name of up to 200 characters. Output returns the new Client ID.
- Add a Currency Adds an extra currency to the company from its ISO 4217 Target Currency code, with an FX Rate from the base currency. That code cannot be changed afterwards.
- Add a Department Creates a department by Name. Use Parent Department to make it a sub-department of another one.
- Add a Milestone Sets a Date marker within a project, optionally linked to one of its phases. Use End Date for a milestone that lasts more than one day.
- Add a Person Adds a team member by Name. Use Role to set the job title from a role, Department to place them, and Available Hours Per Weekday for part-time schedules.
- Add a Phase Splits a project into a phase spanning the Start Date and End Date. Add Budget Total and Default Hourly Rate for the budget and rate, and Color to set the phase color.
- Add a Project Starts a project from a Name, and attaches a Client, Project Manager or Project Code if you have them. Add Start Date and End Date to give it a schedule.
- Add a Project Stage Defines a stage that stands for one Project Status, such as Draft or Confirmed. That status cannot be changed later. Use Sort Order to set where the stage sorts.
- Add a Project Task Creates a task inside a project, optionally within a phase. Turn on Billable only if the project and phase are billable, and use Budget for hours-by-task or fee-by-task budgets.
- Add a Rate Card Creates a rate card under a unique Name. Add a Role and a Bill Rate between 0 and 999999 for each role, and use Clients to limit the card to chosen clients.
- Add a Role Adds a job role under a Name. Set Default Hourly Rate for team members in the role on fee-based projects, and Cost Rate History for dated cost rates.
- Add a Status Records where a person is working, such as Home, Travel or Office, between Start Date and End Date. Add Repeat and Repeat End Date to make it recur.
- Add a Time Off Type Creates a category of time off under a Name, with an optional hex Color. The name * is reserved.
- Create a Logged Time Entry Logs worked Hours for a person against a project, dated with Date. Hours run from 0 to 24 and are rounded to 2 decimals.
- Create a Project Expense Records a cost against a project with a Name, a Date and a Cost. Add Markup for billable expenses.
- Create a Project From Template Copies a template into a new project with a unique Project Code and a Start Date, which schedules the template phases, milestones and tasks. Output has the Process ID.
- Create a Team Holiday Adds a holiday for the team under a Name and Date. Use End Date when it spans several days.
- Create a Time Off Entry Books leave for one or more people, filed under a Time Off Type. Set Start Date and End Date for the span, and Full Day to No to enter Hours Per Day instead.
- Create an Allocation Books people onto a project for a Start Date to End Date range, at a set number of Hours Per Day. Add several names to People and one allocation covers all of them.
- Delete a Client Deletes a client that appears in Float.
- Delete a Currency Removes a currency that was added to the company from Float.
- Delete a Department Removes a department, one grouping of team members, from Float.
- Delete a Logged Time Entry Deletes one logged time entry, a record of hours worked.
- Delete a Milestone Removes a dated milestone marker from a project.
- Delete a Person Deletes a team member from your Float account.
- Delete a Phase Deletes a phase out of the project it belongs to.
- Delete a Project Deletes a project, the unit that holds phases, tasks and allocations, from Float.
- Delete a Project Expense Removes a single expense line from a project.
- Delete a Project Stage Removes a stage that projects could be placed in.
- Delete a Project Task Removes a task, a named piece of work, from a project.
- Delete a Rate Card Deletes a rate card, the bill rates set for each role.
- Delete a Role Removes a job role, a title with default rates, from Float.
- Delete a Status Deletes a status entry for a person.
- Delete a Team Holiday Removes a team holiday from Float.
- Delete a Time Off Entry Deletes a booked leave entry from Float.
- Delete an Allocation Deletes an allocation, the hours booked for people on a project over a date range.
- Make an API Call Makes an authorized free-form request to the Float REST API with your saved credential.
- Merge Project Tasks Combines the Tasks To Merge into one task under Final Name. If a task with that name already exists, the others merge into it.
- Update a Client Renames a client with a new Name of up to 200 characters.
- Update a Currency Sets a new FX Rate for an added currency.
- Update a Department Edits a department. Rename it with Name, move it with Parent Department, or empty the parent through Clear Fields.
- Update a Logged Time Entry Corrects a time entry. Change the Date or Hours, from 0 to 24, or move it to another Project, Phase or Project Task.
- Update a Milestone Moves a milestone to a new Date, renames it, or sets an End Date for one lasting several days. Use Clear Fields to empty chosen values.
- Update a Person Changes a team member. A chosen Role wins over Job Title. Use Person Code to store an ID from another system.
- Update a Phase Revises a phase: its Name, dates, Status or budget. Set a Status that fits the status of the project.
- Update a Project Modifies a project, swapping its Name, Client, Status or Stage as needed.
- Update a Project Expense Edits an expense. Alter its Name, Date or Cost, or move it to another project.
- Update a Project Stage Adjusts a stage. Rename it, reorder it through Sort Order, recolor it, or archive it by setting Active to No.
- Update a Project Task Alters a task. Rename it with Task Name or switch its Billable setting.
- Update a Rate Card Revises a rate card. Set Roles to replace all the roles of the card, and Clients to restrict it to chosen clients.
- Update a Role Edits a role. Update its Name or Default Hourly Rate, or add dated entries to Cost Rate History.
- Update a Status Edits a person status. Change its Status Type, dates or Repeat setting.
- Update a Team Holiday Edits a team holiday through its Name, Date or End Date.
- Update a Time Off Entry Modifies a leave booking. Set People to replace the people on it, or leave it empty to keep them.
- Update a Time Off Type Adjusts a leave category. Rename it, change its Color, or set Active to No to archive it.
- Update an Allocation Changes an allocation. Set People to replace the people on it, or leave it empty to keep them, and use Clear Fields to empty chosen values.
How to integrate Float in automation workflow?
Float in three steps: start with "Watch Allocations", connect one credential, then add your next step.
How Float connects and integrates with WEXTL
Save and approve your credentials once. WEXTL® stores authorization information encrypted and reuses the authentication whenever Float app is called in workflows. That allows your project management automations to run without your attention, per defined schedule[7]. See the integration guide[6] for a detailed list of fields that Float supports.
Full Float API documentationThe following table illustrates what fields Float integration require during authorization flow inside our workflow builder[4].
Connect Float
API Key*Text
••••••••
Contact Email*Text
••••••••
| Field | Type | Help |
|---|---|---|
API KeyRequired | password | In Float, open Account Settings, then Integrations, and create an API key. Only the account owner can see this page. |
Contact EmailRequired | Float asks every integration to identify itself. This email is sent in the User-Agent header so Float can reach you about problems. |
Connect Float to popular apps on WEXTL
Enter a name of the other app you want to sync with Float below. Click on selected app to explore integration options with Float. If the app you search for is not available in WEXTL yet, you can use HTTP node[10] instead to integrate it directly.
Example automation with Float integration
Select Watch Projects trigger from Float - this will be a starting point in your automation. Whenever event happens in Float, workflow will start[7] from Watch Projects node.
Search for Add a Project Stage, connect it as the next step of integration sequence. You can use filters between Watch Projects and Add a Project Stage, so only important data pass from Watch Projects to the next step. WEXTL gives you full control over the process of Float automation. All parts of workflow are visible on the canvas[4].
Float on WEXTL has 112 modules for building project management automations. Explore Float documentation for more.
- FloatWatch Projects
- AcculynxPerforms action
OR
- AcculynxTriggers
- FloatAdd a Project Stage
Frequently asked questions
Common questions about automating Float in your workflows.
What triggers does Float support?
Float has 9 triggers, including "Watch Allocations", "Watch Deleted Allocations", and "Watch Deleted Logged Time Entries", and more. Triggers are start points of the workflow, and automations may start from them.
What actions can I run in Float?
Integration has 103 actions, including "Get a Client", "Get a Currency", and "Get a Department", and more. Refer to our Float Documentation for detailed inputs and outputs.
Do I need to write code to build automations?
No. The 111 Float modules, like "Get a Client", are forms on the canvas: pick a field, map data from an earlier step. Code is optional[4].
Is the integration secure?
Yes. You fill in the Float credential once. WEXTL encrypts it at rest, and only your team can use it.
How does WEXTL integrate with Float?
Through the official Float API: 111 modules, plus "Make an API Call" for any endpoint they don't cover[3].
Can I use webhooks with Float?
Float doesn't push events here, so 9 triggers, like "Watch Allocations" and "Watch Deleted Allocations", check on the schedule you set. Anything Float posts to a URL can start a Custom Webhook node.
Why use WEXTL platform for Float automation?
WEXTL is an AI-first visual canvas: describe the Float flow in plain words and AI wires the nodes[4].
References
List of sources used to gather information about the Float integration.
- Float integration source code, module specs and credentials implementation.
- Internal Float integration documentation, structured input and output parameters, scopes, and authentication methods.
- Official Float vendor API documentation, used to verify field meanings, authentication flows, and anything our own specs don't fully capture.
- WEXTL® Visual Workflow Builder, anonymized data from our technical support team.
- WEXTL® Apps Library
- WEXTL® Float App Documentation
- WEXTL® Workflow Scheduler
- WEXTL® HTTP node documentation
How we write and maintain Float app documentation
Explore how WEXTL® crafted Float integration page documentation. Used sources, the role of AI, and how the team validates the result.





















