Connect Rocketlane integrations
VerifiedCustomer onboarding and project delivery platform, connected to WEXTL workflows and AI agents. Turn Rocketlane project events into updates across your delivery stack. When Watch Events arrives, run Get a Budget or Get a Comment so the team stays aligned.
- 3-day trial
- Cancel anytime
- Up to 10 minutes quick set up
- GDPR
- Data Encryption
- 2FA
- Local Data Region
Supported triggers and actions for Rocketlane integration
Triggers can detect changes in Rocketlane and run actions that can create, search or modify data inside Rocketlane automatically[3], exactly how you set them.
- Watch Events Runs the workflow the moment Rocketlane sends an event, passing along the Event Type, Resource Type, Data and Event Occurred At.
- Watch Invoices Starts the workflow for each new invoice found on a scheduled check. Use Limit to set how many of the most recent invoices the first check returns.
- Watch Projects Scans on a schedule for new projects, or for changed ones too when Watch For is set to New and Updated Items. Leave Customer blank to cover all customers.
- Watch Tasks Polls on a schedule for new tasks, or for changed ones as well through Watch For, running the workflow once per task. Leave Project blank to cover all projects.
- Watch Time Entries Looks for newly logged time entries on each scheduled run and starts the workflow once per entry. Use Limit to set how many recent entries the first check returns.
- Get a Budget Fetches a budget together with Budget Name, Billing Type, Status and Currency. Turn on Include All Details to return every property Rocketlane has for it.
- Get a Comment Looks up a comment and shows its Content and author. Use Extra Details to add Attachments.
- Get a Company Shows a company: Company Name, Company URL, Visibility and Account Owner. Use Extra Details to add Notes.
- Get a Conversation Gets a conversation along with its Description and Private setting. Turn on Include All Details for every property.
- Get a Custom Revenue Recognition Rule Reads a custom revenue recognition rule, giving its Custom Revenue Recognition Config Name and Billing Type.
- Get a Field Pulls a custom field with its Field Label and Object Type, plus Field Type and Rating Scale. Use Extra Details to add the field options.
- Get a Phase Reads a phase, including its Phase Name, Start Date and Due Date. Use Extra Details to add the actual dates or budgets.
- Get a Project Looks up a project and reports its Project Name, Owner, Status and Team Members. Use Extra Details to add figures such as Project Fee or Billable Hours.
- Get a Space Shows a space together with its Space Name, Project and Private setting.
- Get a Space Document Pulls a space document, covering its Space Document Name, Space Document Type and URL.
- Get a Task Gets a task along with Task Name, Start Date, Due Date, Progress and At Risk setting. Use Extra Details to add Assignees, Followers or Dependencies.
- Get a Time Entry Retrieves a time entry, including its Date, Minutes, Activity Name and Billable setting. Use Extra Details to add Notes or Status.
- Get a Time-Off Returns a time-off with its Start Date, End Date, Duration In Minutes and Type. Use Extra Details to add the Note or Notify Users.
- Get a User Opens a user profile with their Email, First Name, Last Name, Type and Status. Use Extra Details to add Role, Company or Permission.
- Get an Invoice Fetches an invoice with its Invoice Number, Date Of Issue, Due Date, Status and Amount Outstanding. Use Extra Details to add Notes or Attachments.
- List Budgets Finds budgets filtered on Project, Company, Billing Type, Name Contains or Created After. Use Default Budgets to show only default or only other budgets, and Sort By to order them.
- List Comments Lists comments across projects, limited by Project, Source Type, Created By or Private. Bound the creation time with Created After and Created Before.
- List Companies Shows the companies in your account. Use Name Contains or Website Contains to search, Account Owners to narrow by owner, and Sort By with Order to arrange rows.
- List Conversations Finds conversations through Project and Name Contains, and keeps only private or only non-private ones with Private.
- List Custom Revenue Recognition Rules Returns custom revenue recognition rules. Use Name Contains to match a name, and Billing Type to keep rules for Fixed Fee or Time and Material.
- List Fields Gathers custom fields, narrowed by Object Type, Field Type, Enabled or Private, and by time through Created After or Updated After.
- List Invoice Line Items Shows the line items of an invoice, each with Description, Quantity, Unit Price and Amount. Use Limit to cap how many are returned.
- List Invoice Payments Returns the payments recorded on an invoice, including Payment Date, Amount, Currency and Notes.
- List Invoices Lists invoices, narrowed by Companies, Status or Invoice Number Contains, with date bounds such as Issued On or After and Due On or Before.
- List Phases Fetches phases for one project. Search them by Name Contains, order them with Sort By and Order, and add actual dates or budgets through Extra Details.
- List Project Placeholders Pulls the placeholders on a project, each with its Placeholder Name, Role and Placeholder Type, one row per placeholder.
- List Projects Lists projects in your account. Search with Name Contains, restrict using Customers, Team Members, Status, Contract Type or Progress, and bound time with Created After or Updated After.
- List Resource Allocations Gets resource allocations for the period running from Start Date to End Date. Narrow them by Team Members or Projects, and use Extra Details to add Member, Task, Placeholder or Duration.
- List Space Documents Shows the documents in a project, optionally within one Space. Search names with Name Contains, or find recent changes with Updated After.
- List Spaces Finds the spaces in a project. Search names with Name Contains, narrow by time through Created After or Updated After, and order them with Sort By.
- List Tasks Gathers tasks filtered by Project, Phase, Assignees, Status or Task Name Contains. Turn on Include Archived to add archived ones, and use External Reference ID to match your own ID.
- List Time Entries Lists time entries for a day or a date range using Date, Date On or After and Date On or Before. Filter further with Project, Task, Team Member, Category or Approval Status.
- List Time Entry Categories Returns the time entry categories in your account, each with a Category Name and Category ID.
- List Time-Offs Lists the time-offs of team members. Use Team Members and Type to filter, the Starts On or After and Ends On or Before dates to bound them, and Extra Details to add the Note.
- List Users Finds users in your account, filtered by Type, Status, Email Contains, First Name Contains or Last Name Contains. Use Extra Details to add Role, Company or Permission.
- Add a Field Option Adds an option to a field, with an Option Label and a Color. Returns the Option Value that identifies it.
- Add a Template to a Project Imports one or more templates into a project, each from its Template ID and Start Date. Use Prefix to put text in front of the names of the template items.
- Add Conversation Members Adds people to a conversation. Use Members for team members and Other Emails for people who are not on that list, such as customers who have not been invited yet. Returns the Conversation ID.
- Add Placeholder Assignments Assigns team members to placeholders on a project. Use Assignments to say which User fills which Placeholder. You get back the Project Name, Team Members and Placeholders.
- Add Project Members Brings people into a project through Team Members and Customers. Use Other Team Member Emails or Other Customer Emails for people who have not been invited yet. Returns the updated Project Name and Team Members.
- Add Task Assignees Assigns people to a task: team members through Assignees, outsiders through Other Emails, and project roles through Placeholders. Returns the Task Name and Assignees.
- Add Task Dependencies Makes a task wait on other tasks. Use Dependencies to list them, Type to pick Finish to Start, Start to Start, Finish to Finish or Start to Finish, and Lag to set the delay between the two tasks.
- Add Task Followers Signs team members up to follow a task through Followers, and outside people through Other Emails. Returns the updated task with its Followers and Assignees.
- Archive a Project Archives a single project in Rocketlane.
- Create a Budget Sets up a budget for a project under a Budget Name, running from Start Date to End Date on the chosen Billing Type. For the Subscription type, add Period Minutes, Period Budget and Number of Periods.
- Create a Comment Writes a Comment as HTML text, placed at task level or inside a project conversation. Turn on Private to keep it among team members. Returns the Comment ID.
- Create a Company Registers a new company owned by an Account Owner. Choose Visibility to share it with Everyone or only Members, and add a Website or Description.
- Create a Company Note Attaches a note to a company under one of its note fields. Set a heading with Note Title, and tag it with Note Tags from that field.
- Create a Conversation Starts a conversation in a project called Name. Choose who joins with Members and Other Member Emails, or add every project member at once. Turn on Private to restrict it to its members.
- Create a Field Creates a custom field on a project, task, user, budget or company, with a Field Label and Field Type. The type cannot be changed later. Use Options for choice fields and Rating Scale to set the top of a scale.
- Create a Phase Opens a phase in a project, giving it a Phase Name, Start Date and Due Date. Use Status to set where it stands. Turn on Private to make it team-only. Returns the Phase ID.
- Create a Project Starts a project with a Project Name and an Owner. Attach a customer with Customer or Customer Name, add people via Team Members and Customers, and choose the billing method with Contract Type.
- Create a Space Opens a space inside a project and names it with Space Name. Turn on Private, and only team members will see the space.
- Create a Space Document Puts a new document into a space. Use Document Type to make a page written in Rocketlane or one that shows a web address, and URL for the address to show. Use From Template ID to base it on a template.
- Create a Task Builds a task for a project. Set Type to make it a milestone, plan it using Effort in Minutes and Progress %, and involve people through Assignees, Followers or Other Assignee Emails.
- Create a Time Entry Logs Minutes spent on a Date for exactly one of a task, phase, project or activity. Turn on Billable to count it as billable. Leave Team Member blank to log time for the API key owner.
- Create a Time-Off Logs time off for a Team Member, starting on Start Date and ending on End Date, as a Full Day, Half Day or Custom Type. Turn on Notify Project Owners to tell them, and add Also Notify for other team members.
- Delete a Budget Deletes a budget from a project in Rocketlane.
- Delete a Comment Removes a posted comment, whether it sits in a project conversation or on a task.
- Delete a Company Deletes one of the companies in your Rocketlane account.
- Delete a Conversation Removes a conversation from a project.
- Delete a Field Deletes a custom field from Rocketlane.
- Delete a Phase Removes one phase out of a project.
- Delete a Project Deletes a project in Rocketlane and returns Success when it is gone.
- Delete a Space Removes a space inside a project.
- Delete a Space Document Deletes a document kept in a space of a project.
- Delete a Task Removes a task that sits inside a project.
- Delete a Time Entry Deletes a tracked time entry from your Rocketlane account.
- Delete a Time-Off Removes a time-off that was created for a team member.
- Make an API Call Makes an authorized free-form request to the Rocketlane REST API with your saved credential.
- Move a Task to a Phase Moves a task into a phase of its project and returns the updated Task Name and Phase.
- Remove Conversation Members Removes people from a conversation. Use Members for team members and Other Emails for addresses of people outside that list.
- Remove Placeholder Assignments Empties Placeholders on a project by unassigning whoever fills them.
- Remove Project Members Removes team members from a project. Use Other Team Member Emails for people who are not on the team member list.
- Remove Task Assignees Unassigns people from a task, either team members through Assignees or addresses through Other Emails. Use Placeholders to clear project roles.
- Remove Task Dependencies Clears dependencies from a task, matching each by the Task it depends on and, if needed, its Type.
- Remove Task Followers Removes followers from a task: team members via Followers and outside people via Other Emails.
- Update a Budget Edits the details of a budget, such as its Budget Name, Start Date, End Date, Billing Type, Budget Amount and Budget Hours. For a Subscription budget, add Subscription Frequency, Period Minutes and Number of Periods.
- Update a Comment Rewrites a comment with new Comment text, or changes its Private setting. Leave Private blank to keep the current value. Rocketlane stores the text as HTML.
- Update a Company Rewrites company details through Company Name, Account Owner, Website, Description or Visibility. Use Clear Fields to blank Website or Description in Rocketlane.
- Update a Conversation Revises the Name and Description of a conversation, or the Everyone in the Project setting. Add Description to Clear Fields to blank it.
- Update a Field Modifies the Field Label, Description, Enabled and Private settings of a custom field. Leave Enabled or Private blank to keep the current value.
- Update a Field Option Sets a New Label or New Color on an option of a field and returns its Option Value, Option Label and Option Color.
- Update a Phase Modifies phase details via Phase Name, Start Date, Due Date, Description, Status or Private. Use Clear Fields to remove the Description text.
- Update a Project Adjusts a project by setting a new Project Name, Owner, Start Date, Due Date, Visibility or Status.
- Update a Space Renames a space, using Space Name for the new name.
- Update a Space Document Edits a space document: its Name, and its URL when it is an embedded document. Use Clear Fields to remove the address.
- Update a Task Revises Task Name, Description, Start Date, Due Date, Effort in Minutes, Type or Status on a task.
- Update a Time Entry Corrects a time entry by changing its Date, Minutes, Activity Name, Notes, Billable setting or Category. Use Clear Fields to blank Activity Name or Notes.
- Update the Manual Revenue Recognition of a Budget Sets the full list of manual revenue recognition entries on a budget, replacing the current ones. Use Entries to supply them, each with a Date and a Revenue or Percentage.
- Update the Milestone Revenue Recognition of a Budget Gives a budget a new set of milestone revenue entries in place of the current ones. Use Milestones to list them, each tied to a Task ID with a Revenue or Percentage.
How to integrate Rocketlane in automation workflow?
Rocketlane in three steps: start with "Watch Events", connect one credential, then add your next step.
STEP 1
Select Rocketlane in workflow
Add the "Watch Events" trigger from Rocketlane to the canvas[4].
STEP 2
Connect Rocketlane
Fill in the Rocketlane credential once. All 95 Rocketlane modules use it[3].
STEP 3
Build a workflow
Add "Get a Budget" or "Get a Comment" after it, then connect any app[5] or the HTTP node.
How Rocketlane connects and integrates with WEXTL
Save and approve your credentials once. WEXTL® stores authorization information encrypted and reuses the authentication whenever Rocketlane app is called in workflows. That allows your project management automations to run without your attention, per defined schedule[7]. See the integration guide[6] for a detailed list of fields that Rocketlane supports.
Full Rocketlane API documentationThe following table illustrates what fields Rocketlane integration require during authorization flow inside our workflow builder[4].
Connect Rocketlane
API Key*Text
••••••••
Region*Text
••••••••
| Field | Type | Help |
|---|---|---|
API KeyRequired | password | In Rocketlane, open your profile menu, then Settings, then API, and choose Create API key. The key has the same access as your user. |
RegionRequired | select | Choose the region your account is hosted in. Most accounts use United States. |
Connect Rocketlane to popular apps on WEXTL
Enter a name of the other app you want to sync with Rocketlane below. Click on selected app to explore integration options with Rocketlane. If the app you search for is not available in WEXTL yet, you can use HTTP node[10] instead to integrate it directly.
Example automation with Rocketlane integration
Select Watch Tasks trigger from Rocketlane - this will be a starting point in your automation. Whenever event happens in Rocketlane, workflow will start[7] from Watch Tasks node.
Search for Add Task Assignees, connect it as the next step of integration sequence. You can use filters between Watch Tasks and Add Task Assignees, so only important data pass from Watch Tasks to the next step. WEXTL gives you full control over the process of Rocketlane automation. All parts of workflow are visible on the canvas[4].
Rocketlane on WEXTL has 96 modules for building project management automations. Explore Rocketlane documentation for more.
- RocketlaneWatch Tasks
- AscoraPerforms action
OR
- AscoraTriggers
- RocketlaneAdd Task Assignees
Frequently asked questions
Common questions about automating Rocketlane in your workflows.
What triggers does Rocketlane support?
Rocketlane has 5 triggers, including "Watch Events", "Watch Invoices", and "Watch Projects", and more. Triggers are start points of the workflow, and automations may start from them.
What actions can I run in Rocketlane?
Integration has 91 actions, including "Get a Budget", "Get a Comment", and "Get a Company", and more. Refer to our Rocketlane Documentation for detailed inputs and outputs.
Do I need to write code to build automations?
No. The 95 Rocketlane modules, like "Get a Budget", are forms on the canvas: pick a field, map data from an earlier step. Code is optional[4].
Is the integration secure?
Yes. You fill in the Rocketlane credential once. WEXTL encrypts it at rest, and only your team can use it.
How does WEXTL integrate with Rocketlane?
Through the official Rocketlane API: 95 modules, plus "Make an API Call" for any endpoint they don't cover[3].
Can I use webhooks with Rocketlane?
Yes. "Watch Events" is instant: Rocketlane pushes each event, so there is no polling delay.
Why use WEXTL platform for Rocketlane automation?
WEXTL is an AI-first visual canvas: describe the Rocketlane flow in plain words and AI wires the nodes[4].
References
List of sources used to gather information about the Rocketlane integration.
- Rocketlane integration source code, module specs and credentials implementation.
- Internal Rocketlane integration documentation, structured input and output parameters, scopes, and authentication methods.
- Official Rocketlane vendor API documentation, used to verify field meanings, authentication flows, and anything our own specs don't fully capture.
- WEXTL® Visual Workflow Builder, anonymized data from our technical support team.
- WEXTL® Apps Library
- WEXTL® Rocketlane App Documentation
- WEXTL® Workflow Scheduler
- WEXTL® HTTP node documentation
How we write and maintain Rocketlane app documentation
Explore how WEXTL® crafted Rocketlane integration page documentation. Used sources, the role of AI, and how the team validates the result.





















