2Solar and Float Integration
Build project management workflows between 2Solar and Float on a visual canvas. Set up data fields sync between apps once and let data flow when events come automatically. Integration will work without code and your team will see the workflow inside WEXTL® builder.
- 3-day trial
- Cancel anytime
- Up to 10 minutes quick set up
- GDPR
- Data Encryption
- 2FA
- Local Data Region
Learn about 2Solar and Float
Detailed info you need to know about 2Solar and Float integrations in WEXTL. Explore which modules apps support and how you connect them.
How to connect 2Solar to Float
Set up your 2Solar and Float integration in 3 simple steps[2]. No coding required. Up to 10 minutes setup.
STEP 1
Connect 2Solar and Float
Save credentials in WEXTL once. We store them encrypted and reuse the authorization across every workflow[3]. No coding or API skills required.
STEP 2
Build a workflow
Paste selected 2Solar and Float nodes onto the canvas[4], or describe what you want and WEXTL wires the flow together with AI Builder.
STEP 3
Map your data
Choose which fields need to sync between 2Solar and Float. Use filters or a JS custom code step in between. Everything is on the canvas.
How does the integration between 2Solar and Float work in WEXTL?
WEXTL exposes actions and triggers for 2Solar and Float that help you connect apps and automate repetitive tasks[1]. A trigger is an event that happens, and an action is a step that performs when the event has occurred.
Float triggers2Solar actions
Float modules
- Add a Client Adds a client to Float under a Name of up to 200 characters. Output returns the new Client ID.
- Add a Currency Adds an extra currency to the company from its ISO 4217 Target Currency code, with an FX Rate from the base currency. That code cannot be changed afterwards.
- Add a Department Creates a department by Name. Use Parent Department to make it a sub-department of another one.
- Add a Milestone Sets a Date marker within a project, optionally linked to one of its phases. Use End Date for a milestone that lasts more than one day.
- Add a Person Adds a team member by Name. Use Role to set the job title from a role, Department to place them, and Available Hours Per Weekday for part-time schedules.
- Add a Phase Splits a project into a phase spanning the Start Date and End Date. Add Budget Total and Default Hourly Rate for the budget and rate, and Color to set the phase color.
- Add a Project Starts a project from a Name, and attaches a Client, Project Manager or Project Code if you have them. Add Start Date and End Date to give it a schedule.
- Add a Project Stage Defines a stage that stands for one Project Status, such as Draft or Confirmed. That status cannot be changed later. Use Sort Order to set where the stage sorts.
- Add a Project Task Creates a task inside a project, optionally within a phase. Turn on Billable only if the project and phase are billable, and use Budget for hours-by-task or fee-by-task budgets.
- Add a Rate Card Creates a rate card under a unique Name. Add a Role and a Bill Rate between 0 and 999999 for each role, and use Clients to limit the card to chosen clients.
- Add a Role Adds a job role under a Name. Set Default Hourly Rate for team members in the role on fee-based projects, and Cost Rate History for dated cost rates.
- Add a Status Records where a person is working, such as Home, Travel or Office, between Start Date and End Date. Add Repeat and Repeat End Date to make it recur.
- Add a Time Off Type Creates a category of time off under a Name, with an optional hex Color. The name * is reserved.
- Create a Logged Time Entry Logs worked Hours for a person against a project, dated with Date. Hours run from 0 to 24 and are rounded to 2 decimals.
- Create a Project Expense Records a cost against a project with a Name, a Date and a Cost. Add Markup for billable expenses.
- Create a Project From Template Copies a template into a new project with a unique Project Code and a Start Date, which schedules the template phases, milestones and tasks. Output has the Process ID.
- Create a Team Holiday Adds a holiday for the team under a Name and Date. Use End Date when it spans several days.
- Create a Time Off Entry Books leave for one or more people, filed under a Time Off Type. Set Start Date and End Date for the span, and Full Day to No to enter Hours Per Day instead.
- Create an Allocation Books people onto a project for a Start Date to End Date range, at a set number of Hours Per Day. Add several names to People and one allocation covers all of them.
- Delete a Client Deletes a client that appears in Float.
- Delete a Currency Removes a currency that was added to the company from Float.
- Delete a Department Removes a department, one grouping of team members, from Float.
- Delete a Logged Time Entry Deletes one logged time entry, a record of hours worked.
- Delete a Milestone Removes a dated milestone marker from a project.
- Delete a Person Deletes a team member from your Float account.
- Delete a Phase Deletes a phase out of the project it belongs to.
- Delete a Project Deletes a project, the unit that holds phases, tasks and allocations, from Float.
- Delete a Project Expense Removes a single expense line from a project.
- Delete a Project Stage Removes a stage that projects could be placed in.
- Delete a Project Task Removes a task, a named piece of work, from a project.
- Delete a Rate Card Deletes a rate card, the bill rates set for each role.
- Delete a Role Removes a job role, a title with default rates, from Float.
- Delete a Status Deletes a status entry for a person.
- Delete a Team Holiday Removes a team holiday from Float.
- Delete a Time Off Entry Deletes a booked leave entry from Float.
- Delete an Allocation Deletes an allocation, the hours booked for people on a project over a date range.
- Get a Client Retrieves one client, returning its Client ID and Name.
- Get a Currency Shows one added currency with its Source Currency and Target Currency. Use Expand to include the FX Rates.
- Get a Department Looks up one department, giving its Department ID, Name and Parent ID.
- Get a Logged Time Entry Reads one logged time entry with its Hours, Date, Billable flag and Notes.
- Get a Milestone Fetches a milestone with its Date, End Date and the project it belongs to.
- Get a People Report Builds a per-person hours report for the days between Start Date and End Date, covering Capacity, Scheduled, Billable and Overtime. Add Person to report on one person only.
- Get a Person Retrieves one team member with their Email, Job Title and Department. Use Expand to add the Account, Managers or Contracts.
- Get a Phase Reads one phase with its Start Date, End Date and Budget Total. Use Expand to add the Phase Team.
- Get a Project Fetches a project with its Client ID, Budget Type and Default Hourly Rate. Use Expand to add Expenses, Phases, Project Tasks, Project Team or Currency.
- Get a Project Expense Reads one expense along with its Cost, Quantity and Markup, and whether it is Billable.
- Get a Project Report Builds a per-project hours report for the days between Start Date and End Date, covering Scheduled, Billable and Non-Billable. Add Project to report on one project only. Float allows 30 report requests a minute.
- Get a Project Stage Looks up one stage with its Project Status and Sort Order. Use Expand to add the Project Count.
- Get a Project Task Retrieves a project task along with its Task Name and Budget, and whether it is Billable.
- Get a Project Template Reads a template made in Float, with its Budget Type, Budget Total and Currency Code.
2Solar modules
- Add Images to a Request/Person Attaches pictures to an existing request, supplied as a list of Images with an Image URL each, in jpg, jpeg or png format. A confirmation Message is returned.
- Create a Request for a Person Opens a request for a person from their First Name, Last Name and Email. Add address details through Postcode and Number, plus a Request Type, Reference Number or Extra Fields. Returns the Request ID and Person ID.
- Get a Person Reads one person by Person ID, including their Language, Profession and Company name.
- Make an API Call Makes an authorized free-form request to the 2Solar REST API with your saved credential.
- Search Requests Finds requests matching a Search text. Bound them with Date Created From and Date Created Until, or with Updated From and Updated To, and set With Documents to include form documents and invoices.
- Update a Request Changes the details stored for a person and their request, such as Email, Telephone, Postcode, Comments or Installation Date. Output reports which fields were Updated.
Explore alternative integrations
There are other apps[9] supported by WEXTL that can be paired with 2Solar and Float integrations. Pick any from the list below if the current combination isn't the one you need.
Frequently asked questions
Common questions about connecting 2Solar and Float.
References
List of sources used to gather information about the 2Solar and Float integration.
- 2Solar and Float integration source code, module specs and credentials implementation.
- Our 2Solar and Float integration documentation, structured input and output parameters, scopes, and authentication methods.
- Official vendor API documentation for 2Solar and Float, used to verify field meanings, authentication flows, and anything our own specs don't fully capture.
- WEXTL® visual workflow builder, anonymized data from our technical support team.
- 2Solar integration information
- Float integration information
- WEXTL® Scheduling
- WEXTL® Pricing and Trial
- WEXTL® Apps Library
How we write our apps documentation
Explore how WEXTL® crafted 2Solar and Float integration page documentation. Used sources, the role of AI, and how the team validates the result.

