Asana and Float Integration
Build project management workflows between Asana and Float on a visual canvas. Set up data fields sync between apps once and let data flow when events come automatically. Integration will work without code and your team will see the workflow inside WEXTL® builder.
- 3-day trial
- Cancel anytime
- Up to 10 minutes quick set up
- GDPR
- Data Encryption
- 2FA
- Local Data Region
How to connect Asana to Float
Set up your Asana and Float integration in 3 simple steps[2]. No coding required. Up to 10 minutes setup.
STEP 1
Connect Asana and Float
Save credentials in WEXTL once. We store them encrypted and reuse the authorization across every workflow[3]. No coding or API skills required.
STEP 2
Build a workflow
Paste selected Asana and Float nodes onto the canvas[4], or describe what you want and WEXTL wires the flow together with AI Builder.
STEP 3
Map your data
Choose which fields need to sync between Asana and Float. Use filters or a JS custom code step in between. Everything is on the canvas.
How does the integration between Asana and Float work in WEXTL?
WEXTL exposes actions and triggers for Asana and Float that help you connect apps and automate repetitive tasks[1]. A trigger is an event that happens, and an action is a step that performs when the event has occurred.
Asana triggersFloat actions
Asana modules
- Add a Goal Collaborator Makes people collaborators on a goal and puts the updated goal in the output. Use Followers to list the new collaborators.
- Add a Section Task Moves a task into a section and, with Insert Before or Insert After, places it next to a chosen task.
- Add a Task Project Places a task into one more project, with Project as the destination. Pass Insert After or Insert Before to land it next to another task in that list.
- Add a Team User Puts a user onto a team within the workspace identified by Workspace GID.
- Add a Workspace User Brings a user into an Asana workspace or organization. The added person is returned with Name, Email and Photo.
- Add Project Followers Subscribes people to a project as followers. Use Followers to list them by GID, email or me. Output includes the Status.
- Add Project Users Puts people on a project as members. Use Members to name the users to add.
- Add Task Followers Makes users followers of a task. Name them as GIDs, emails or me.
- Approve an Access Request Accepts a request for access, found through its Target object.
- Create a Budget Defines a budget for one Parent, as Cost or Time by Budget Type. Use Estimate and Actual to enter the amounts, and Total to configure how the total portion is set.
- Create a Custom Field Defines a text, single choice, several choices or number custom field, according to its Resource Subtype, inside a Workspace. Use Enum Options for the choices and Format to show currency or percentages.
- Create a Goal Adds an objective to your Workspace under a Name. Assign an Owner, set its dates with Start On and Due On, and link a Team or a Time Period.
- Create a Goal Relationship Connects a goal, project, task or portfolio as a supporter of a parent goal. Use Supporting Resource for the supporter and Contribution Weight from 0 to 1 for how much its progress counts.
- Create a Membership Gives a Member access on a Parent. Use Access Level for Viewer, Commenter, Editor or Admin.
- Create a Portfolio Starts a portfolio called Name, belonging to a Workspace. Use Color for its look, Start On and Due On for its dates and Default Access Level to set Admin, Editor or Viewer.
- Create a Project Opens a project called Name within a Workspace. Use Default View to show it as List, Board, Calendar or Timeline, and Color, Icon or Current Status Update for its look and first status.
- Create a Project from a Template Builds a project from an existing template for a team, named with Project Name. Add Requested Dates and Requested Roles for the template variables, and Is Strict to reject missing dates.
- Create a Rate Sets a monetary Rate for a Resource, which is a user or placeholder, on a Parent.
- Create a Role Sets up a permission role labelled by Name and Description. Use Base Role Type to start from Guest, Member, Admin or Super Admin, and Permissions to refine what the role can do.
- Create a Section Adds a section called Name to a project, positioned with Insert Before or Insert After.
- Create a Story Posts a comment on a task. Write it as Text or HTML Text, turn on Is Pinned to pin it, and add a Sticker Name to attach a sticker.
- Create a Task Adds a task to Asana with a Name and a Resource Subtype of default task, milestone, approval or custom. Use Due On, Assignee or Notes for the details, and turn on Completed to create it already finished.
- Create a Team Makes a team within an Organization called Name. Set Visibility to Secret, Request to Join or Public, and use the access level fields to limit who edits, invites or removes members.
- Create an Access Request Requests access to a Target object. Add a Message to give context for the request.
- Create an Allocation Books time for a person between a Start Date and an End Date. Use Assignee for who, Parent for where and Effort to give hours or a percentage.
- Create an OOO Entry Records an absence between Start Date and End Date for a User at a Workspace.
- Delete a Budget Deletes the budget set on a Parent. Output has the deleted Budget type and Estimate.
- Delete a Custom Field Removes a custom field definition that belongs to a Workspace.
- Delete a Goal Deletes one objective, given its GID.
- Delete a Membership Ends one access entry on an object, identified by Membership GID.
- Delete a Portfolio Removes a single portfolio from your Asana account.
- Delete a Project Deletes a project from your Asana workspace, using its Project ID.
- Delete a Project Template Deletes a stored template using Project Template ID.
- Delete a Rate Removes a rate, given its Rate ID.
- Delete a Role Removes a custom role, using Role ID.
- Delete a Section Removes a section from a project, optionally scoped by Project GID.
- Delete a Story Removes a single comment on a task.
- Delete a Task Deletes one to-do item, using Task GID.
- Delete an Allocation Deletes one booked block of time by its allocation ID.
- Delete an Attachment Removes the file or link identified by Attachment GID.
- Delete an OOO Entry Cancels a recorded absence entry for a User.
- Duplicate a Project Copies a project into a fresh one with a new Name. Use Include to pick elements to copy and Schedule Dates to shift the dates of the copied tasks.
- Duplicate a Task Makes a copy of a task with a new Name. Use Include Fields to carry over Assignee, Attachments, Dates or Dependencies.
- Get a Budget Reads one budget. The output has the Budget type, Estimate and Actual values.
- Get a Custom Field Pulls the definition of one custom field. Look at Type and Enum options to see what values it accepts.
- Get a Goal Opens a single goal and shows its HTML notes, Notes and the dates around it.
- Get a Goal Relationship Checks how one item supports a goal, reporting the Supporting resource and its Contribution weight.
- Get a Membership Returns one membership, naming the Member, the Parent object and the Resource subtype.
- Get a Portfolio Shows the Name of a single portfolio inside a Workspace.
- Get a Project Fetches the basic record of a project, namely its Name, from a Project ID.
Float modules
- Add a Client Adds a client to Float under a Name of up to 200 characters. Output returns the new Client ID.
- Add a Currency Adds an extra currency to the company from its ISO 4217 Target Currency code, with an FX Rate from the base currency. That code cannot be changed afterwards.
- Add a Department Creates a department by Name. Use Parent Department to make it a sub-department of another one.
- Add a Milestone Sets a Date marker within a project, optionally linked to one of its phases. Use End Date for a milestone that lasts more than one day.
- Add a Person Adds a team member by Name. Use Role to set the job title from a role, Department to place them, and Available Hours Per Weekday for part-time schedules.
- Add a Phase Splits a project into a phase spanning the Start Date and End Date. Add Budget Total and Default Hourly Rate for the budget and rate, and Color to set the phase color.
- Add a Project Starts a project from a Name, and attaches a Client, Project Manager or Project Code if you have them. Add Start Date and End Date to give it a schedule.
- Add a Project Stage Defines a stage that stands for one Project Status, such as Draft or Confirmed. That status cannot be changed later. Use Sort Order to set where the stage sorts.
- Add a Project Task Creates a task inside a project, optionally within a phase. Turn on Billable only if the project and phase are billable, and use Budget for hours-by-task or fee-by-task budgets.
- Add a Rate Card Creates a rate card under a unique Name. Add a Role and a Bill Rate between 0 and 999999 for each role, and use Clients to limit the card to chosen clients.
- Add a Role Adds a job role under a Name. Set Default Hourly Rate for team members in the role on fee-based projects, and Cost Rate History for dated cost rates.
- Add a Status Records where a person is working, such as Home, Travel or Office, between Start Date and End Date. Add Repeat and Repeat End Date to make it recur.
- Add a Time Off Type Creates a category of time off under a Name, with an optional hex Color. The name * is reserved.
- Create a Logged Time Entry Logs worked Hours for a person against a project, dated with Date. Hours run from 0 to 24 and are rounded to 2 decimals.
- Create a Project Expense Records a cost against a project with a Name, a Date and a Cost. Add Markup for billable expenses.
- Create a Project From Template Copies a template into a new project with a unique Project Code and a Start Date, which schedules the template phases, milestones and tasks. Output has the Process ID.
- Create a Team Holiday Adds a holiday for the team under a Name and Date. Use End Date when it spans several days.
- Create a Time Off Entry Books leave for one or more people, filed under a Time Off Type. Set Start Date and End Date for the span, and Full Day to No to enter Hours Per Day instead.
- Create an Allocation Books people onto a project for a Start Date to End Date range, at a set number of Hours Per Day. Add several names to People and one allocation covers all of them.
- Delete a Client Deletes a client that appears in Float.
- Delete a Currency Removes a currency that was added to the company from Float.
- Delete a Department Removes a department, one grouping of team members, from Float.
- Delete a Logged Time Entry Deletes one logged time entry, a record of hours worked.
- Delete a Milestone Removes a dated milestone marker from a project.
- Delete a Person Deletes a team member from your Float account.
- Delete a Phase Deletes a phase out of the project it belongs to.
- Delete a Project Deletes a project, the unit that holds phases, tasks and allocations, from Float.
- Delete a Project Expense Removes a single expense line from a project.
- Delete a Project Stage Removes a stage that projects could be placed in.
- Delete a Project Task Removes a task, a named piece of work, from a project.
- Delete a Rate Card Deletes a rate card, the bill rates set for each role.
- Delete a Role Removes a job role, a title with default rates, from Float.
- Delete a Status Deletes a status entry for a person.
- Delete a Team Holiday Removes a team holiday from Float.
- Delete a Time Off Entry Deletes a booked leave entry from Float.
- Delete an Allocation Deletes an allocation, the hours booked for people on a project over a date range.
- Get a Client Retrieves one client, returning its Client ID and Name.
- Get a Currency Shows one added currency with its Source Currency and Target Currency. Use Expand to include the FX Rates.
- Get a Department Looks up one department, giving its Department ID, Name and Parent ID.
- Get a Logged Time Entry Reads one logged time entry with its Hours, Date, Billable flag and Notes.
- Get a Milestone Fetches a milestone with its Date, End Date and the project it belongs to.
- Get a People Report Builds a per-person hours report for the days between Start Date and End Date, covering Capacity, Scheduled, Billable and Overtime. Add Person to report on one person only.
- Get a Person Retrieves one team member with their Email, Job Title and Department. Use Expand to add the Account, Managers or Contracts.
- Get a Phase Reads one phase with its Start Date, End Date and Budget Total. Use Expand to add the Phase Team.
- Get a Project Fetches a project with its Client ID, Budget Type and Default Hourly Rate. Use Expand to add Expenses, Phases, Project Tasks, Project Team or Currency.
- Get a Project Expense Reads one expense along with its Cost, Quantity and Markup, and whether it is Billable.
- Get a Project Report Builds a per-project hours report for the days between Start Date and End Date, covering Scheduled, Billable and Non-Billable. Add Project to report on one project only. Float allows 30 report requests a minute.
- Get a Project Stage Looks up one stage with its Project Status and Sort Order. Use Expand to add the Project Count.
- Get a Project Task Retrieves a project task along with its Task Name and Budget, and whether it is Billable.
- Get a Project Template Reads a template made in Float, with its Budget Type, Budget Total and Currency Code.
Explore alternative integrations
There are other apps[9] supported by WEXTL that can be paired with Asana and Float integrations. Pick any from the list below if the current combination isn't the one you need.
Frequently asked questions
Common questions about connecting Asana and Float.
References
List of sources used to gather information about the Asana and Float integration.
- Asana and Float integration source code, module specs and credentials implementation.
- Our Asana and Float integration documentation, structured input and output parameters, scopes, and authentication methods.
- Official vendor API documentation for Asana and Float, used to verify field meanings, authentication flows, and anything our own specs don't fully capture.
- WEXTL® visual workflow builder, anonymized data from our technical support team.
- Asana integration information
- Float integration information
- WEXTL® Scheduling
- WEXTL® Pricing and Trial
- WEXTL® Apps Library
How we write our apps documentation
Explore how WEXTL® crafted Asana and Float integration page documentation. Used sources, the role of AI, and how the team validates the result.

