Fieldwire and Nozbe Integration
Keep Fieldwire and Nozbe matched by integrating their events and actions. When project management events happen in Fieldwire, update the Nozbe automatically - without any line of code in visual workflow builder.
- 3-day trial
- Cancel anytime
- Up to 10 minutes quick set up
- GDPR
- Data Encryption
- 2FA
- Local Data Region
Learn about Fieldwire and Nozbe
Detailed info you need to know about Fieldwire and Nozbe integrations in WEXTL. Explore which modules apps support and how you connect them.
How to connect Fieldwire to Nozbe
Set up your Fieldwire and Nozbe integration in 3 simple steps[2]. No coding required. Up to 10 minutes setup.
STEP 1
Connect Fieldwire and Nozbe
Save credentials in WEXTL once. We store them encrypted and reuse the authorization across every workflow[3]. No coding or API skills required.
STEP 2
Build a workflow
Paste selected Fieldwire and Nozbe nodes onto the canvas[4], or describe what you want and WEXTL wires the flow together with AI Builder.
STEP 3
Map your data
Choose which fields need to sync between Fieldwire and Nozbe. Use filters or a JS custom code step in between. Everything is on the canvas.
How does the integration between Fieldwire and Nozbe work in WEXTL?
WEXTL exposes actions and triggers for Fieldwire and Nozbe that help you connect apps and automate repetitive tasks[1]. A trigger is an event that happens, and an action is a step that performs when the event has occurred.
Fieldwire triggersNozbe actions
Fieldwire modules
- Create a Project Starts a Fieldwire project using the Project settings, always with a Name. Add an Address, Currency or Code for extra detail. Returns the new project with its Account ID and Time zone.
- Create a Submittal Opens a submittal under a Name, with an optional Description, Lead Time and On Site Date. Link it to a type with Submittal Type ID and to a specification section with Spec Section ID.
- Create a Task Makes a task with a Priority of 1, 2 or 3, an Owner User ID and a Creator User ID. Use Due Date for the completion date, Cost Value for its monetary cost, and Position X and Position Y for the floorplan pin.
- Create an Attachment Registers an attachment on a project from its File URL and Name. Use Kind to classify it as File, Photo, Video, Photo Sphere or Sign, and Latitude to record where a photo was created.
- Delete a Project Deletes a project that exists on your Fieldwire account.
- Delete a Project Attachment Removes one attachment record from a project.
- Delete a Submittal Removes one submittal that exists in a project.
- Delete a Task Deletes a task that sits on one of your projects.
- Get a Project Retrieves a project together with its Name, Address, Currency and Time zone.
- Get a Project Activity Returns one activity record for a project, listing Tasks, Sheets, Markups and Attachments.
- Get a Project Attachment Looks up one attachment on a project and returns its Name, Kind, File URL, File size and Thumb URL.
- Get a Project Task Shows one task on a project, returning its Name, Priority, Due date and Owner user ID.
- Get a Submittal Reads a submittal, giving its Name, Status, Reference number and Revision number.
- List Project Attachments Lists attachments for a project, each with its Name, Kind and File URL. Use Limit to cap the result count.
- List Project Submittals Shows project submittals, filtered by Name Like, Submittal Type ID Equal, Overdue Equal or Created At Greater Than. Use Limit to cap how many return.
- List Project Templates Lists the templates available for new projects in your account. Use Fieldwire Filter to include deleted templates or all of them.
- List Projects Retrieves the projects on your account, with active ones as the default. Set Fieldwire Filter to All or Deleted to include those, and use Limit to cap the count.
- List Tasks Pulls tasks for a project, narrowed by Status ID Equal, Owner User ID Equal, Tag Like or Due Date Less Than. Use Last Synced At to include updates since a timestamp, and Limit to cap the results.
- Make an API Call Calls the Fieldwire REST API directly with a free-form request under your saved credential.
- Restore a Project Attachment Recovers an attachment that was deleted from a project, whether a file, photo or video.
- Restore a Task Restores a deleted task in a project and returns it with its Name, Status ID and Priority.
- Transfer a Project Passes a project on to a user who must be authorized to transfer.
- Transition a Submittal Moves a submittal to another state, from Draft through Closed or Void. Use Assignee User ID to assign it, which every state except closed requires, and Message to email a note.
- Update a Project Edits a project under its required Name. Use Tasks Enabled or Photo Attachments Enabled to show those tabs, and Address, Code or Currency for its details.
- Update a Submittal Modifies a submittal through its Name, Description, Lead Time or On Site Date.
- Update a Task Updates a task with its required Editor User ID, Owner User ID and Priority. Use Man Power Value to estimate effort and Status ID to set its status.
- Watch Tasks Checks tasks on a project on your schedule, filtered by Status ID, and emits each as an item with its Task ID. Use Limit to set the maximum number of results worked with in one cycle.
Nozbe modules
- Add a Team Member Enrols a user in a team with a Role and Status. Fill Alias, Description and Contact Info to describe the member inside the team, or turn on Favorite to star them.
- Add an Attachment Uploads a File as an attachment on a comment in Nozbe. Set File Name to store it under another name.
- Add Attachment Metadata Registers an attachment record on a comment with its File Name, MIME Type and Size (Bytes), without sending any content. Fill the content in later with Upload Attachment Content.
- Add Project Access Gives a team member access to a project. Turn on Manager to make that person a project manager.
- Create a Comment Posts a Text comment on a task. Turn on Pinned to keep it at the top and Visible To Team to make it a team comment.
- Create a Group Assignment Places a project or a team member into a project group. Set Group Type to tell Nozbe which of the two the Project or Member ID refers to.
- Create a Project Adds a team project to Nozbe. Switch on Template to make it a template project or Single Actions for a single actions project, and set Color to tint it.
- Create a Project from a Template Copies a template project into a live one. Set Name to title it and Team to place it in a team.
- Create a Project Group Adds a group for organising projects in a team. Turn on Private to make the group private.
- Create a Project Section Creates a section inside a project, titled with Name. Set Position to place it among the sections already there.
- Create a Reminder Sets a reminder on a task for Remind At. Turn on Relative to count from the due time, All Day for a date-only reminder and Urgent to flag it.
- Create a Tag Defines a tag by Name, with optional Color and Icon. Add a Team to scope it and Favorite to star it.
- Create a Tag Assignment Attaches an existing Tag to a task so the task shows that label.
- Create a Task Writes a new task under Name. File it with Project and Section ID, assign it with Responsible, set Due and All Day for the deadline, and size the work with Time Needed.
- Create a Task Recurrence Makes a repeat rule for a task. Use Pattern to write the recurrence the way Nozbe expects it, and Current Task ID to start the rule from that task.
- Create a User Adds a person by Name and Color. Placeholders have no account yet, and an Invitation Email can be stored for inviting them later.
- Delete a Comment Deletes a comment from a task discussion in Nozbe.
- Delete a Group Assignment Unlinks a project or team member from a project group.
- Delete a Project Deletes a project in Nozbe and returns its ID.
- Delete a Project Group Removes a project group from a team and returns its ID.
- Delete a Project Section Deletes a section that sits inside a project.
- Delete a Reminder Cancels a reminder that was set on a task.
- Delete a Tag Assignment Removes a tag from a task.
- Delete a Task Deletes a task in Nozbe. The task cannot be undone once it is deleted.
- Delete a Task Recurrence Removes the repeat rule behind a recurring task.
- Delete a Team Member Deletes the membership of a user in a team.
- Delete an Attachment Deletes a file attachment from a comment.
- Delete Project Access Revokes the access that a team member holds on a project.
- Download Attachment Content Downloads the content of one attachment on a comment as a File, with its File Name and Content Type.
- Get a Business Fetches one business with its Plan Info and the Ai Credits Used.
- Get a Business Member Looks up a member of a business and reads their Role and Vacations.
- Get a Comment Retrieves a comment with its Body, author and Edited At time.
- Get a Group Assignment Pulls one group assignment with its Group ID, Object ID and Group Type.
- Get a Project Reads a project and its Team ID, Author ID and Ended At.
- Get a Project Group Fetches the Name of a group of projects and whether it Is Private, to see how a team organises its projects.
- Get a Project Section Shows the Name, Position and Archived At of one project section.
- Get a Reminder Looks up a reminder to read when it fires at Remind At, and whether it Is Urgent.
- Get a Tag Retrieves a tag with its Color, Icon and Team Color.
- Get a Tag Assignment Pulls the pair joined by a tag assignment, namely its Tag ID and Task ID.
- Get a Task Reads a task with its Name, Project ID, Project Section ID and Responsible ID.
- Get a Task Event Shows an event logged on a task, including the Integration that raised it and its Last Modified time.
- Get a Task Recurrence Fetches a repeat rule with its Pattern and Current Task ID.
- Get a Team Looks up a team to read its Limits and see whether it Is Personal.
- Get a Team Member Retrieves a team membership with the member Role, Alias and Description.
- Get a User Reads one user with their Name, Color and Avatar URL.
- Get an Attachment Shows the record of one attachment on a comment, such as its Name, Mime Type and Status.
- Get New Tasks Since Last Call Collects tasks created since the last time this API token asked Nozbe, which tracks that position on its side. Add a Project or Responsible to cover only part of your work.
- Get Project Access Opens one project access record to see which Member ID holds it and whether Is Manager is set.
- Get Updated Tasks Since Last Call Collects tasks changed since the last time this API token asked Nozbe, which tracks that position on its side. Add a Project or Responsible to keep the result to some of your tasks.
- Import a CSV Loads records into Nozbe from a CSV File. Set Import to say what kind of records the file holds.
Explore alternative integrations
There are other apps[9] supported by WEXTL that can be paired with Fieldwire and Nozbe integrations. Pick any from the list below if the current combination isn't the one you need.
Frequently asked questions
Common questions about connecting Fieldwire and Nozbe.
References
List of sources used to gather information about the Fieldwire and Nozbe integration.
- Fieldwire and Nozbe integration source code, module specs and credentials implementation.
- Our Fieldwire and Nozbe integration documentation, structured input and output parameters, scopes, and authentication methods.
- Official vendor API documentation for Fieldwire and Nozbe, used to verify field meanings, authentication flows, and anything our own specs don't fully capture.
- WEXTL® visual workflow builder, anonymized data from our technical support team.
- Fieldwire integration information
- Nozbe integration information
- WEXTL® Scheduling
- WEXTL® Pricing and Trial
- WEXTL® Apps Library
How we write our apps documentation
Explore how WEXTL® crafted Fieldwire and Nozbe integration page documentation. Used sources, the role of AI, and how the team validates the result.

