AgencyZoom and Float Integration

Demonstration of how apps are integrated in WEXTL workflow builder[4]

Keep AgencyZoom and Float matched by integrating their events and actions. When project management events happen in AgencyZoom, update the Float automatically - without any line of code in visual workflow builder.

  • 3-day trial
  • Cancel anytime
  • Up to 10 minutes quick set up
  • GDPR
  • Data Encryption
  • 2FA
  • Local Data Region

Learn about AgencyZoom and Float

Detailed info you need to know about AgencyZoom and Float integrations in WEXTL. Explore which modules apps support and how you connect them.

  • AgencyZoom

    • Project Management
    • 3 triggers
    • 7 searches
    • 12 actions

    Sales and onboarding platform for insurance agencies, with producer leaderboards and goal tracking.[5]

  • Float

    • Project Management
    • 9 triggers
    • 47 searches
    • 56 actions

    Resource planning for people, projects and schedules.[6]

How to connect AgencyZoom to Float

Set up your AgencyZoom and Float integration in 3 simple steps[2]. No coding required. Up to 10 minutes setup.

How does the integration between AgencyZoom and Float work in WEXTL?

WEXTL exposes actions and triggers for AgencyZoom and Float that help you connect apps and automate repetitive tasks[1]. A trigger is an event that happens, and an action is a step that performs when the event has occurred.

AgencyZoom triggersFloat actions

AgencyZoom modules

  • Complete a Task Marks a task in Agency Zoom as completed, using the Task ID of an existing task. Reopen a Task reverses it later.
  • Create a Business Lead Adds a commercial lead to a pipeline with its First Name, Email, Pipeline ID, Lead Source ID, Assigned To and Country. Add Business Name, FEIN, Annual Revenue and Payroll to record the company side.
  • Create a Note Attaches a Note to a lead, found by Lead ID. The Message, ID and Result of the new note are the output.
  • Create a Personal Lead Adds an individual prospect to a pipeline with a First Name, Email, Country, Pipeline ID, Lead Source ID and a producer for Assigned To. Use Birthday, Marital Status or Nickname for personal details.
  • Create a Task Schedules a task for a contact, found by Contact Email, with a Task Title, Assignee ID, Task Type and Due Date Time. Attach it to a lead with Lead ID or add Invitees. Returns the ID of the new task.
  • Delete a Lead Removes a lead from your Agency Zoom account.
  • Delete a Task Deletes an existing task from Agency Zoom.
  • Get a Lead Reads the full record of one lead, including its names, Lead Type, contact details and address. Use Search Leads when you do not know the lead yet.
  • Get a Task Reads a single task with its Title, Status, Due Date, Duration and Comments.
  • List Lead Notes Collects the notes written on a single lead, each with its Type, Create Date, Created by, Title and Body. Use Limit to cap the count.
  • List Lead Opportunities Finds the insurance opportunities tied to one lead, showing the Carrier ID, Product Line ID, Status and Premium of each. Set Limit to trim the output length.
  • List Lead Tasks Gathers every task attached to one lead, listing the Status, Due Date and Comments of each. Use Limit to restrict the result count.
  • Make an API Call Runs a free-form request against the AgencyZoom REST API using your saved credential.
  • Reopen a Task Switches a completed task back to active. Add Task Notes to record why it was reopened.
  • Search Leads Looks up leads by Status, Assigned To, Lead Source ID or the beginning of a Customer Name, Customer Email or Customer Phone. Narrow with creation dates or Sold Period, and order results with Sort By.
  • Search Tasks Finds tasks by Task Status, Task Type, Assignee ID, Lead Source ID or a predefined Period such as Today or Next Week. Use Sort Field and Order to arrange the results.
  • Update a Business Lead Edits a business lead chosen with Lead ID, such as its Business Name, DBA, FEIN, Business Classification or Number of Employees. Returns a Message, ID and Result for the change.
  • Update a Personal Lead Edits an individual lead identified by Lead ID, covering its First Name, Last Name, Phone, Street Address, Birthday and Tag Names.
  • Update a Task Revises the task chosen with Task ID: its Task Title, Due Date Time, Assignee ID, Duration or Invitees. Turn on Time Specific if the due time matters.
  • Watch New Leads Polls Agency Zoom on a schedule and emits each lead created since the previous check. Use Limit to set how many leads one check handles.
  • Watch New Tasks Runs on a polling schedule and fires once for every task added since the previous check. Use Limit to bound the number handled per cycle.
  • Watch Updated Leads Scheduled check for leads that were edited or gained activity, emitting each one as it is found. Set Limit to control how many leads a single execution works through.

Float modules

  • Add a Client Adds a client to Float under a Name of up to 200 characters. Output returns the new Client ID.
  • Add a Currency Adds an extra currency to the company from its ISO 4217 Target Currency code, with an FX Rate from the base currency. That code cannot be changed afterwards.
  • Add a Department Creates a department by Name. Use Parent Department to make it a sub-department of another one.
  • Add a Milestone Sets a Date marker within a project, optionally linked to one of its phases. Use End Date for a milestone that lasts more than one day.
  • Add a Person Adds a team member by Name. Use Role to set the job title from a role, Department to place them, and Available Hours Per Weekday for part-time schedules.
  • Add a Phase Splits a project into a phase spanning the Start Date and End Date. Add Budget Total and Default Hourly Rate for the budget and rate, and Color to set the phase color.
  • Add a Project Starts a project from a Name, and attaches a Client, Project Manager or Project Code if you have them. Add Start Date and End Date to give it a schedule.
  • Add a Project Stage Defines a stage that stands for one Project Status, such as Draft or Confirmed. That status cannot be changed later. Use Sort Order to set where the stage sorts.
  • Add a Project Task Creates a task inside a project, optionally within a phase. Turn on Billable only if the project and phase are billable, and use Budget for hours-by-task or fee-by-task budgets.
  • Add a Rate Card Creates a rate card under a unique Name. Add a Role and a Bill Rate between 0 and 999999 for each role, and use Clients to limit the card to chosen clients.
  • Add a Role Adds a job role under a Name. Set Default Hourly Rate for team members in the role on fee-based projects, and Cost Rate History for dated cost rates.
  • Add a Status Records where a person is working, such as Home, Travel or Office, between Start Date and End Date. Add Repeat and Repeat End Date to make it recur.
  • Add a Time Off Type Creates a category of time off under a Name, with an optional hex Color. The name * is reserved.
  • Create a Logged Time Entry Logs worked Hours for a person against a project, dated with Date. Hours run from 0 to 24 and are rounded to 2 decimals.
  • Create a Project Expense Records a cost against a project with a Name, a Date and a Cost. Add Markup for billable expenses.
  • Create a Project From Template Copies a template into a new project with a unique Project Code and a Start Date, which schedules the template phases, milestones and tasks. Output has the Process ID.
  • Create a Team Holiday Adds a holiday for the team under a Name and Date. Use End Date when it spans several days.
  • Create a Time Off Entry Books leave for one or more people, filed under a Time Off Type. Set Start Date and End Date for the span, and Full Day to No to enter Hours Per Day instead.
  • Create an Allocation Books people onto a project for a Start Date to End Date range, at a set number of Hours Per Day. Add several names to People and one allocation covers all of them.
  • Delete a Client Deletes a client that appears in Float.
  • Delete a Currency Removes a currency that was added to the company from Float.
  • Delete a Department Removes a department, one grouping of team members, from Float.
  • Delete a Logged Time Entry Deletes one logged time entry, a record of hours worked.
  • Delete a Milestone Removes a dated milestone marker from a project.
  • Delete a Person Deletes a team member from your Float account.
  • Delete a Phase Deletes a phase out of the project it belongs to.
  • Delete a Project Deletes a project, the unit that holds phases, tasks and allocations, from Float.
  • Delete a Project Expense Removes a single expense line from a project.
  • Delete a Project Stage Removes a stage that projects could be placed in.
  • Delete a Project Task Removes a task, a named piece of work, from a project.
  • Delete a Rate Card Deletes a rate card, the bill rates set for each role.
  • Delete a Role Removes a job role, a title with default rates, from Float.
  • Delete a Status Deletes a status entry for a person.
  • Delete a Team Holiday Removes a team holiday from Float.
  • Delete a Time Off Entry Deletes a booked leave entry from Float.
  • Delete an Allocation Deletes an allocation, the hours booked for people on a project over a date range.
  • Get a Client Retrieves one client, returning its Client ID and Name.
  • Get a Currency Shows one added currency with its Source Currency and Target Currency. Use Expand to include the FX Rates.
  • Get a Department Looks up one department, giving its Department ID, Name and Parent ID.
  • Get a Logged Time Entry Reads one logged time entry with its Hours, Date, Billable flag and Notes.
  • Get a Milestone Fetches a milestone with its Date, End Date and the project it belongs to.
  • Get a People Report Builds a per-person hours report for the days between Start Date and End Date, covering Capacity, Scheduled, Billable and Overtime. Add Person to report on one person only.
  • Get a Person Retrieves one team member with their Email, Job Title and Department. Use Expand to add the Account, Managers or Contracts.
  • Get a Phase Reads one phase with its Start Date, End Date and Budget Total. Use Expand to add the Phase Team.
  • Get a Project Fetches a project with its Client ID, Budget Type and Default Hourly Rate. Use Expand to add Expenses, Phases, Project Tasks, Project Team or Currency.
  • Get a Project Expense Reads one expense along with its Cost, Quantity and Markup, and whether it is Billable.
  • Get a Project Report Builds a per-project hours report for the days between Start Date and End Date, covering Scheduled, Billable and Non-Billable. Add Project to report on one project only. Float allows 30 report requests a minute.
  • Get a Project Stage Looks up one stage with its Project Status and Sort Order. Use Expand to add the Project Count.
  • Get a Project Task Retrieves a project task along with its Task Name and Budget, and whether it is Billable.
  • Get a Project Template Reads a template made in Float, with its Budget Type, Budget Total and Currency Code.

Explore alternative integrations

There are other apps[9] supported by WEXTL that can be paired with AgencyZoom and Float integrations. Pick any from the list below if the current combination isn't the one you need.

Automate AgencyZoom and Float on WEXTL®

Claim your 3-day trial to build AgencyZoom with Float integration and access every WEXTL® feature.

Cancel anytime.

Frequently asked questions

Common questions about connecting AgencyZoom and Float.

How do I connect AgencyZoom and Float?

Connect your AgencyZoom and Float accounts once, pick a trigger in one app and an action in the other, then map the fields so data flows automatically between them.[3]

What can I automate between AgencyZoom and Float?

Example: when the "Watch New Leads" trigger in AgencyZoom fires, WEXTL can "Add a Client" in Float. AgencyZoom has 3 triggers (including Watch New Leads, Watch New Tasks, and Watch Updated Leads). Float has 103 actions (including Add a Client, Add a Currency, and Add a Department). Add filters and transforms between steps when you need them.[1]

Can AgencyZoom trigger actions in Float, and Float in AgencyZoom?

Yes. The integration works in both directions. Use the triggers of each app to start a workflow and the actions of the other app to update it.[2]

Do I need to write code to integrate AgencyZoom and Float?

No. AgencyZoom-to-Float automations are built visually on the canvas. You can optionally add custom JavaScript with Functions when you need advanced logic.[4]

Does AgencyZoom integrate with Float in real time?

Yes. Trigger-based automations start the moment AgencyZoom (or Float) fires a new event. Webhook-backed apps run within seconds, and polling-only apps re-check on a schedule you control.[7]

How long does it take to set up a AgencyZoom + Float integration?

A first automation typically takes 5–10 minutes: connect the credential of each app once, drop a trigger + action onto the canvas, map the fields, and turn the workflow on.

Do I need a paid plan to connect AgencyZoom with Float?

You can build your AgencyZoom + Float automation on a 3-day trial with every feature unlocked. Cancel anytime.[8]

References

List of sources used to gather information about the AgencyZoom and Float integration.

  1. AgencyZoom and Float integration source code, module specs and credentials implementation.
  2. Our AgencyZoom and Float integration documentation, structured input and output parameters, scopes, and authentication methods.
  3. Official vendor API documentation for AgencyZoom and Float, used to verify field meanings, authentication flows, and anything our own specs don't fully capture.
  4. WEXTL® visual workflow builder, anonymized data from our technical support team.
  5. AgencyZoom integration information
  6. Float integration information
  7. WEXTL® Scheduling
  8. WEXTL® Pricing and Trial
  9. WEXTL® Apps Library

How we write our apps documentation

Explore how WEXTL® crafted AgencyZoom and Float integration page documentation. Used sources, the role of AI, and how the team validates the result.

Explore AgencyZoom and Float, or get started